1. Current Location: Home >  NAS >  In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

in order to toss, I changed the PVE (Proxmox Virtual Environment) as the bottom All-in-One to the FlyOS (FlyOS) as the bottom All-in-One, and recorded the energy consumption changes in the whole process to see if the power was saved after the tossing. Let's start with the picture

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

PVE plus the power consumption of 12W is basically 12W

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

PVE the standby power consumption of Aikai Kuaijia Feiniu OS (I forgot to measure the power consumption of running full broadband)

 

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

Feiniu OS plus iKuai standby power consumption

image.png

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

Feiniu OS plus Aikuaid to pull the power consumption of 1000M bandwidth.

overall, FlyOS is the underlying All-in-One energy consumption is lower, after all, there is one less system. Don't look at the little power consumption saved, over the years...... It seems that you can still buy 2 pounds of meat.

let's talk about how to implement the virtual machine installation of Aikuai under Feiniu OS, and at the same time manage NAS and iKuai.

1. After installing Feiniu OS, go to the Application Center to install the application virtual machine.

2. Turn on OVS for a network card, the network card I chose 1, so that after installing iKuai, iKuai crashed, and you can also plug it into other routers to manage the NAS, so that the NAS will not lose contact.

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

3. Open the virtual machine application and turn on CPU virtualization, IOMMU, and hardware direct. (IOMMU can also be left unturned, I use it for pass-through network cards when I turn it on)

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

3. To create a new virtual machine, select Yes for boot and set the network settings as shown in the following figure

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

4. After installing iKuai, log in to iKuai and pull the Feiniu OS management network port into the LAN.

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

restart the N100, wait for a while, the computer and the flying bull can obtain the IP, and no matter how you restart the flying bull, you will not lose contact.

why did you choose pass-through in the end, the pass-through performance is stronger, what is there to say? Turn on all network cards without going straight OVS

In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router

Read More


Copyright Notice Scan to read on mobile
All Rights Reserved: 《SHUNOT》 => 《In order not to waste the 4-network port N100 small host Feiniu NAS, install a router to save a router
Article URL: https://www.shunot.com/en/nas/684.html
Unless otherwise stated, all articles are original by 《Routing enthusiast》. Reposting is welcome! Please indicate the original URL when reposting, thank you.

Comment List

The south wind ha...
The south wind ha...Reply
#2
The key is to use one system to manage multiple functions, which is worry-free and cost-saving, suitable for users who want to streamline their devices.
4 个月前
One thought is pe...
One thought is pe...Reply
#1
Feiniu OS plus Aikuai does save power, but the tossing process is a bit complicated, and it is necessary to reasonably configure virtualization and network settings to make the two systems work together to achieve energy-saving effects.
4 个月前

Contact Us

Online Consultation: Click here to send me a message

WeChat ID: master_135

Scan to follow