NAS powers on and off on schedule, with backup units running 8,300 hours less per year

Last year, I moved my retired Synology DS220j to my mom's house as a remote backup machine, running rsync every day at 3:40 a.m. to sync the photos and document increments at home. I wrote about the full process in the article remote backup. When configuring, I made a decision: turn off the hard drive into hibernation, so the drive wouldn't be still sleepy and unable to wake up when the task started.
I only recently carefully calculated the cost of the decision to sleep with Guan Xiuan. Plug the metering socket up: when the machine isn't working, it's twelve or thirteen watts, and the two plates buzz and spin. The task itself only needs a dozen minutes of daily increment, meaning the machine actually works for 20 minutes a day, with the remaining 23 hours and 40 minutes powered on and idle. Over the course of a year, out of 8,760 electrified hours, less than 130 hours actually work.
First, break down the three key points: scheduled restart, scheduled shutdown, and scheduled power on/off
When I was digging through my own old grievances, I found that this matter was especially easy to confuse with the other two matters, so I had to talk about them separately.
Scheduled restarts are a cure for lag. I once wrote an article Should NAS be restarted regularly? The conclusion is that most legitimate NAS don't need to: restarting to interrupt seeding or backup windows yields little benefit. That article was about "stop messing around," which doesn't conflict with today's issue—today it's about getting a machine that shouldn't be online year-round to clock in and out on time.
Only scheduled shutdown without scheduled startup is half-baked. The machine shut down at 4:30 a.m., and no one powered it on the next day. The backup stopped that very night. My mom couldn't possibly get up every morning to press the NAS power button. So the complete structure is an assembly line: scheduled startup, tasks running as usual, scheduled shutdown—three segments connected together to form a complete structure.
There's also a prerequisite: can you turn off your machine? My N100 Feiniu can't be turned off at all—the surveillance footage is written inward, qBittorrent is holding the breed, Jellyfin is ready to release footage at any moment. The machines that can power on and off at scheduled times are those with a single role: pure backup machines, cold standby transfer stations, and occasionally powered on experimental machines. The DS220j is exactly the first of its kind.
Where is Synology's power plan: one power on and one on when shut down
Synology has made this feature available in the Hardware and Power → Planning tab → the control panel. Click to create three types of plans: startup, shutdown, and restart. I built two of my mom's cars
| planned | type time | for |
|---|---|---|
| Startup | is 03:20 | minutes before the task, leaving the system a startup time |
| Shutdown | is 04:30 every | day Task 00 finishes around 4 o'clock, leaving plenty of redundancy in the window |
The task itself is still the same as before, with the daily 03:40 rsync schedule in the plan, and not a single line has been changed. The boot time doesn't follow the task settings: Synology is fully ready from power to DSM, starting at three to four minutes. Although the task plan will be rescheduled after the system starts, there may be some service delays. 20 minutes of margin, safe and reliable.
On
the same page, under the "Power Recovery" tab, there's another option to decide: when power is restored after a power outage, the machine should be turned on, shut off, or restore to its previous state. I chose "Restore Previous State." The logic is simple—my mom's house tripped during the day, and when the power went out, the machine was already off. After the power came back, it stayed off and woke up by itself at 3:20 p.m. that night, so the backup was not delayed at all. If you choose "Always On," it will turn on and work until the next morning as soon as the power comes in, which is equivalent to 20 hours wasted. This option is the same idea as the UPS article about self-start when called, but it's used for machines that mainly shut down, so the direction is reversed.
How to wake up after turning off the computer: Timed startup is the main router, WOL is just for show
The
scheduled startup relies on the RTC clock on the motherboard; even when the machine is powered off, it runs and automatically powers on when the time comes. This is the main circuit, no external devices. Even if my mom's house loses power and trips, it doesn't affect the next day's punctual wake-up time.
Wake-up WOL on LAN is another method. In the power recovery tab, check "Enable LAN Wake-up" and send a magic package to the network card to wake the machine. The principle is < a href="https://www.shunot.com/en/192-168-1-1/1024.html" > the remote boot articleIt has been dismantled. But WOL has a weak spot: the device being sent has to be on the same network segment. There's no always-on device under my mom's router that can do this. If you want to power it on temporarily during the day and back it up, you have to call my mom to press the power button—you know how the old lady operates. So WOL is just for display at my mom's house. I hooked it up but rarely used it. If I really needed something, like running full load below, I'd just ask the machine not to turn off the machine the night before.
Three pitfalls: power outages, full usage, and system updates—don't argue with shutdown times
Once the assembly line runs, there are three scenes that muddy the water, and I've touched or rehearsed them all.
The first was a power outage hitting the backup window. My mom's house had a switch trip last year, and the backup silence failed for three nights before I realized it. This forced me to set up a alert。 In the scheduled power-on version, these issues are even more hidden: the machine starts and shuts down on time, everything is "normal," but if the switch trips between 3:20 and 4:30, after the call comes and you press "restore previous state," it can still resume. But if the call comes past 4:30, the machine will sleep until the next day, and the backup will be empty that night. Whether it can be relied upon depends entirely on whether the alarm channel is still there—the email machine is also online at fixed times every day, so it must still be awake when the alarm is sent. I also moved the trigger time for the alarm task into the backup window.
The second is full volume. The first 206GB full sync took two nights at the time, so a 70-minute window was out of the picture. The correct approach at this time is to plan the power supply: turn off the "shutdown" option, run the machine all night, and only activate it after it runs completely. Any hourly big job—full backups, major system version updates, RAID rebuilds—fall into this category. Don't expect to be crammed into the daily window.
The third is to update without choosing the window to do it. When the DSM update notification popped up, I was itching to get my hands on it. At 4 a.m., the machine was on by itself, I clicked upgrade, and halfway through the upgrade, the shutdown plan triggered at 4:30 — I can't imagine that scene. Synology handles updates on its own before updating, but to be safe, system updates are left for manual startup users to do during the day, and the window only lets it back up one task.
Electricity bills are a small account, while the hours the grid is powered is a large ledger
Settle accounts. Before the timer: 12.5 watts multiplied by 24 hours multiplied by 365 days, about 110 kWh, annual electricity cost about 60 yuan. After setting the timer: power on for 70 minutes daily, with 18W for startup plus backup read/write data, less than 8 kWh per year, costing 4 yuan. Saving over fifty yuan a year, enough for a good meal, but honestly, it's not enough to break even.
What truly matters is the life of those two 4TB drives. The DS220j consists of two old drives that have been used for five or six years as RAID1. The lifespan of mechanical drives is based on how many times the power is powered, < the article on a href="https://www.shunot.com/en/nas/843.html" > the hard drive failureI've written about how to pronounce the Power_On_Hours in SMART. Previously, 8,760 hours of grinding in a year turned into 427 hours, so that's over 8,300 hours less in a year, essentially slowing down the old years of these two old properties. If the disk on the backup machine breaks, don't worry about the data—the main database is still there—but the money and time for disk replacement are still money, and if the remote backup fails, you'll be left bare.
Let's take it personally: pure backup machines, cold standby transfer machines, experimental machines—just blindly use this set; Those with surveillance footage, those hanging up for seeding, those running Home Assistant hubs, family members who always want to watch the library—don't turn off any of them. Honestly, set them to 7x24 and put hard drive to sleepAdjusting it well is more practical. My family now has two NAS, one and one around the clock, clockwise clock-in/out, each doing their own thing, no one holding up the other.
| Reasons why machines can power on and off at | ||
|---|---|---|
| Pure backup or cold standby | rotation works, working with your eyes | closed foronly a few dozen minutes a day, the rest is idle |
| Surveillance | recorders cannot | Videos need to be downloaded at 7x24; turning off the phone leaves a blank window |
| Holding a storage or download | system that can't | be done is basically a waste |
| Audio/smart center | can't | be used by family members at any time; turning it off is just a complaint |
Here's a wrap-up
order: first confirm whether the machine role can be turned off, then go to the power plan to set the boot and shutdown settings, set "Power Restore" to the previous state, and finally move the trigger time for the alarm task into the boot window. After completing these four steps, the machine goes from being available year-round to clocking in on time, saving about fifty yuan in electricity bills annually, and the lifespan of the unit doubles in profit.